
Construction of the building began in the early 1970s as the Computing Center of the State Planning Committee of the Uzbek SSR, according to the project of the UzNIIP Urban Planning Institute (architect — Richard Bleze and others). For a long time, the building remained unfinished.
In 2010, on its
basis, the «Poytaxt» business center was opened.
The building
housed company offices, conferences were held on the sixth floor, and the two
upper floors were occupied by a hotel.
In 2022, the
property was purchased by a company from the UAE and reconstruction began.
Before the
reconstruction, the building corresponded to the «Karimov» style: white walls,
blue glass, and a granite plinth.
The Seamstresses’ Palace of Culture from the “Red Dawn” sewing factory was built in 1936 according ...

On the square in front of the Chorsu market stands an old brick building that catches the eye. On t...
The three turquoise domes next to the Kukeldash Madrasah are visible from afar and define the lands...

The residential building on the former Pushkin Street was built in 1931 according to the design of ...